Shahd Cleopatra vessel dismantling operation
Dismantling

Shahd Cleopatra Vessel Dismantling Project

Client:Egyptian Environmental Agency
Location:Egyptian Port
Date:November 2025
Duration:3 weeks
By Almancy Team

Complete dismantling and removal of the Shahd Cleopatra vessel, requiring precision cutting and environmental safety measures.

The Challenge

The Shahd Cleopatra vessel was deemed beyond economic repair and required complete dismantling and removal. The project required careful planning to ensure environmental compliance, safe removal of hazardous materials, and efficient cutting of the vessel's steel structure. All work had to be conducted without disrupting nearby port operations.

Our Solution

Our specialized team developed a comprehensive dismantling plan that prioritized safety and environmental protection. We used underwater cutting equipment combined with surface operations to systematically dismantle the vessel. Hazardous materials were carefully identified and removed before structural cutting began. Our divers worked in coordination with crane operators to remove cut sections efficiently.

Project Gallery

Initial vessel assessment
Underwater cutting operations
Section removal in progress
Final dismantling stages

The Results

The vessel was completely dismantled and removed within 3 weeks, meeting all environmental and safety standards. Over 500 tons of steel were recovered for recycling. The operation was completed with zero environmental incidents, and the area was restored to normal port use immediately upon completion.